River stages released for March 15

Listed below are the river gauges as of Thursday, March 15. The stages are released daily by the US Army Corp of Engineers Vicksburg District.

Black River @ Acme, LA- flood stage 48 feet
Latest Stage 45.96 Ft.
24 Hr. Change +1.11 Ft.

Red River @ Alexandria, LA- Flood stage 34 feet
Latest Stage 35.92 Ft.
24 Hr. Change +0.98 Ft.

Red River @ Lock & Dam No. 1 (upper)- flood stage 53 feet
Latest Pool Level 55.03 Ft.
24 Hr. Change +1.09 Ft.

Red River @ Lock & Dam No. 1 (lower)- flood stage 53 feet
Latest Stage 51.89 Ft.
24 Hr. Change +1.10 Ft.

Atchafalaya River at Simmesport- flood stage 47 feet
Latest Stage 33.54 Ft.
24 Hr. Change +0.51 Ft.